Client Zone / Machine setup

Set up your machine with confidence

Unpack, assemble, connect, and complete the first controlled startup of a CNC Singular system.

Assembly video

Unpacking and assembling CNC Singular

The 4:12 video shows removal from the shipping box, mechanical assembly, connection of power and USB, and the first orientation in Candle.

First commissioning

From transport box to ready controller

  1. Position and assemble.Use a level working surface, follow the mechanical assembly sequence, and allow access around the machine.
  2. Connect safely.Connect the supplied power adapter, USB communication cable, and air supply hose before the first test.
  3. Prepare the PC link.Install the applicable CH340 / CH341 USB driver, open the sender software, and select the controller port at 115200 Baud.
  4. Initialize motion.Unlock the controller if it reports ALARM, then run homing with $H.
  5. Set your coordinates.Use the G92 setup corresponding to your machine and head before sending a spray program.
Operating instructions

Read before first operation

The complete manual contains safety, installation, Candle setup, G-code basics, external control notes, spare parts, and error-state guidance.

Safety check

Before a real spray test

  • Keep hands, cables, samples, and fixtures clear of the portal travel.
  • Perform cleaning and maintenance only with the machine switched off.
  • For volatile or flammable liquids, use appropriate extraction and comply with applicable ATEX responsibilities.
Shopping Cart
Scroll to Top